Pear Orchard Road water main relocation
The city hired Strand Associates to design upgrades from Cleveland/Creekview to Lakewood Park, evaluating curb-and-gutter, sidewalks, and multi-use paths. Council members noted the new sidewalks have prevented pedestrian accidents in a corridor where several people were hit this year.
Henry Street stormwater drainage project
The city is replacing an aging drainage line through dozens of backyards between West Dixie and Beach Street, which requires 54 easements — 23 signed so far. Council wants torn-up lawns restored with sod by the contractor, with homeowners handling watering.
Late natural gas utility bills and suspended penalties
Gas Department engineer Matthew Hobbs walked the council through staffing, inspections, and system capacity — including a $100,000-a-year savings from the natural gas prepay program. The department faces a growing federal regulatory load on distribution, transmission, and storage.
Wastewater plant expansion and capacity
The plant is at 62% of capacity and the state has the completed facility plan under review. The phased expansion starts with a new admin building and equipment for new state rules, with the full capacity build (est. ~$120 million) coming later depending on growth. The berm damaged in April storms also needs repair via an upcoming municipal order.
Stormwater program performance and upcoming capital projects
The stormwater department earned a perfect MS4 audit score and is studying the two worst flooding spots from last year's record rains. Expect budget requests for a new inspector, a vehicle replacement, and major projects like the Valley Creek Lake and Trooper Lake restorations and Henry Street phase two.